Pickering City Centre
CAD 520K
starting price
About this project
Pickering City Centre is a 55-acre, $5.6B+ masterplan community by CentreCourt transforming Downtown Pickering. Block 1 delivers 4 mixed-use towers and 2,100 suites with 120K+ sq ft of indoor and outdoor amenities, anchored by a direct connection to Pickering GO Station, the 700K sq ft Pickering Town Centre Mall, a 130K sq ft office building, future public park and Pickering City Hall. Architecture by Diamond Schmitt, interiors by Figure3 — with a 20,000 sq ft fitness & wellness centre, rooftop pool, golf simulator, multiple co-working spaces, social lounges, community courtyard and a Cleveland Clinic Canada virtual clinic. Six stops to Union Station via the Pickering GO line and 300m to Highway 401.
“55-acre masterplan at the heart of Downtown Pickering — direct to GO, 2,100 suites in Block 1”
Architecture & Design
Architect
Diamond Schmitt
Interior Designer
Figure3
Storeys
55
Type
high rise
What this place offers
Fitness & Recreation
20,000 sq ft Fitness & Wellness Centre
Cardio, weights, free weights, weight machines, sauna and change rooms
Spin Bike Studio
Dedicated spin / cycling studio
Private Workout Rooms
Private workout rooms for personal training
Outdoor & Terrace
Rooftop Pool
Rooftop infinity-style pool with city and waterfront views
Community Courtyard
Central outdoor courtyard at the heart of PCC
Social & Entertainment
Social Lounges
Multiple lounges for meeting neighbours and entertaining guests
Party Room
Party room for hosting friends and family
Indoor Golf Simulator
Year-round golf simulator to keep your swing fresh
Wellness & Spa
Cleveland Clinic Canada Virtual Clinic
Dedicated in-building virtual clinic with Cleveland Clinic Canada for cutting-edge medical diagnostics
Work & Meetings
Co-Working Spaces
Multiple co-working spaces across each tower with Wi-Fi and meeting rooms
Private Study Areas
Dedicated private study areas
Services
Grand Lobby & 24-hour Concierge
Wide open lobby with mail room, parcel and 24-hour concierge
Pickering Town Centre Mall
Direct integration with the 700,000 sq ft Pickering Town Centre Mall (180+ shops)
On-site Office Building
130,000 sq ft office building on-site
Direct GO Station Connection
Direct, weather-protected connection to Pickering GO Train Station
Floor Plans
16 plans available
Documents
Sign in to viewSign in to view brochures, price lists, and full project documents.
Pricing Details
Sign in to viewDeposit Structure
Sign in to viewIncentives
Sign in to viewLocation
1355 Kingston Road (Pickering Town Centre Entrance 5) · Kingston Road & Liverpool Road · L1V 1B8
Key Dates
Occupancy
Tentative Q4 2027
Completion
2028-Q4
What's Nearby
Transit
Highways
Shopping
Schools
Parks
Features
- 55-acre masterplan community by CentreCourt
- $5.6B+ total development value
- 2,100 suites across 4 towers in Block 1
- 120,000+ sq ft of amenities (45K indoor / 75K outdoor)
- Direct connection to Pickering GO Train Station
- 6 stops to Union Station
- 300m to Highway 401
- Architecture by Diamond Schmitt
- Interiors by Figure3
- On-site Cleveland Clinic Canada virtual clinic
- Adjacent to 700K sq ft Pickering Town Centre Mall
- On-site 130K sq ft office building
- Future Durham-Scarborough BRT corridor
- Durham Region — fastest-growing GTA submarket (8.8% pop. growth)
- CentreCourt: 19 high-rise projects, 10,500+ suites sold, $5.6B+ development value
CAD 520K
2100 units · 2028-Q4