Woodbine Parkside
CAD 999K
starting price
About this project
Woodbine Parkside by 95 Developments is a master-planned community of 107 elegant 3-storey homes at Woodbine Avenue and Major Mackenzie Drive East in prestigious Cathedraltown, Markham. The collection spans five product types — The Rosewood (single-detached, 3,039-3,102 sq.ft. with optional elevator), The Sage (semi-detached with private backyard, 2,415-2,467 sq.ft.), The Ivy (rear-lane towns with double-car garage and rooftop terrace, 2,016-2,449 sq.ft.), The Cedar (Traditional 5.6m towns), and The Clover (Traditional 5.85m towns, both 2,003-2,293 sq.ft.). Direct connection to Ernest Wideman Park — a true park-side living experience. Features include 10' main floor / 9' ground & upper ceilings, smooth ceilings throughout, quartz countertops, vinyl flooring, 24-hour surveillance, and Level II EV-ready garages. Tentative closing Spring 2027.
“Elegant Low-Rise Living in Cathedraltown, Markham — Park-Connected Community”
Architecture & Design
Architect
95 Developments Design Team
Storeys
3
Type
townhouse
What this place offers
Outdoor & Terrace
Ernest Wideman Park Access
1-minute walk to Ernest Wideman Park — direct park-side living
Private Rooftop Terrace
Expansive rooftop terrace with parkland views (Ivy rear-lane towns)
Private Backyard
Private backyard (Cedar, Clover Traditional Towns and Sage semi-detached)
Services
EV-Ready Level II Garage
Level II EV charger rough-in standard in every garage
24-Hour Surveillance
Community-wide 24-hour surveillance system
Other
Double-Car Garage
Two-car attached garage (Ivy rear-lane towns and Rosewood single-detached)
In-Home Elevator
Optional in-home elevator (Rosewood Collection)
Floor Plans
5 plans available
Documents
Sign in to viewSign in to view brochures, price lists, and full project documents.
Pricing Details
Sign in to viewDeposit Structure
Sign in to viewIncentives
Sign in to viewLocation
Woodbine Avenue and Major Mackenzie Drive East, Cathedraltown, Markham · Woodbine Avenue and Major Mackenzie Drive East · L6C 0G2
Key Dates
Occupancy
Spring 2027
Completion
2027-Q2
What's Nearby
Transit
Highways
Shopping
Schools
Parks
Features
- 3-storey homes across 5 distinct collections
- Direct connection to Ernest Wideman Park (1 min walk)
- 10' ceiling on main floor, 9' on ground and upper floors
- Smooth ceilings throughout
- Quartz countertops throughout (3 finish packages: Budget Series, Carrera, Calacatta gold)
- Vinyl flooring throughout (LVT, upgraded LVT, or engineered hardwood per package)
- Slab-style, Shaker, or premium White Oak kitchen cabinetry options
- 12"x24" or 24"x24" or 24"x48" bathroom tiles (per package)
- Brushed nickel, matte black, or brushed gold plumbing fixtures (per package)
- Elevator upgrade option (Rosewood Collection)
- Double-car garage (Ivy & Rosewood Collections)
- Rooftop terrace (Ivy Collection)
- Private backyard (Cedar, Clover & Sage Collections)
- Private driveway on Sage semi-detached
- 24-hour surveillance system
- EV-ready Level II garage
- In-law suite option (multiple collections)
- Optional den or study layouts
- Tarion 7-year structural warranty
CAD 999K
107 units · 2027-Q2